
The Sri Delima MRT station is a mass rapid transit (MRT) station that is built to serve the suburbs of Taman Sri Delima and Kampung Batu Delima in Kuala Lumpur.
The station is located along Jalan Kepong, next to the Batu river reservoir. The Tenaga Nasional Kepong branch is located right behind the station.
Brem Mall is located 330m southeast of the station, across Jalan Kepong.
The Sri Delima MRT station is one of the stations being built as part of the Klang Valley Mass Rapid Transit (KVMRT) project on the MRT Putrajaya Line.
It is scheduled to begin operations on 16 June 2022 as part of Phase One operations of the line.



✭ Want to see more pictures? Check out the pictures taken during the construction of Sri Delima MRT station.
Location
The Sri Delima MRT station is located along Jalan Kepong, next to the Batu river reservoir.


Facilities and services
The Sri Delima MRT station provides following facilities and services at the station for the convenience of the passengers.
- Feeder Bus
- Lift
- Escalator
- Public Toilets
- Surau
- Ticket Vending Machine
- Customer Service Office
- Island Platform
Disabled-friendly Facilities
The following disabled-friendly facilities can be found at the Sri Delima MRT station.
- Ramp access
- Tactile tiles
- Braille for the lift buttons
- Low counters for wheel chair users
- Low lift buttons for wheel chair users
- Disabled-friendly toilets
- Staff at stations to provide assistance
Station statistics
Sri Delima MRT station | |
---|---|
Location | Taman Sri Delima, Kuala Lumpur, Malaysia |
Lines | MRT Putrajaya Line |
Structure | Elevated |
Platforms | 1 island platform |
Tracks | 2 |
Parking | Available, paid parking |
Bicycle facilities |
Not applicable |
Opened | 16 June 2022 |
Owned by | Rapid Rail |
Reference | Sri Delima station on wikipedia |
MRT stations of MRT Putrajaya Line
The MRT Putrajaya Line is the second line of the KVMRT Project to be developed after the successful completion of first line — MRT Kajang Line in July 2017.

The MRT Putrajaya alignment will have a length of 57.7km, consisting of 44.2km of elevated tracks and 13.5km running through underground tunnels. It has 39 operational stations of which 30 are elevated and 9 underground. A further 4 stations have been provided for the future.
Stations for MRT Putrajaya Line | |
---|---|
![]() ![]() |
|
![]() |
|
![]() ![]() |
|
![]() |
|
![]() |
|
![]() ![]() |
|
![]() |
|
![]() |
|
![]() |
|
![]() |
|
![]() |
|
![]() ![]() |
Site Search
Did you find what you are looking for? Try out the enhanced Google Search: