The Sungai Buloh MRT Station is an elevated MRT station serving the suburb of Sungai Buloh in Selangor, it is located at the Northwest of Kuala Lumpur.

The newly built integrated Sungai Buloh station was opened on 16 December 2016 together with the opening of the first phase of the MRT Kajang Line. It was initially designated as the Northern terminus of the MRT Kajang Line service.

When Phase One operations for the MRT Putrajaya Line began on June 16, 2022, this Sungai Buloh MRT station which was previously part of the
MRT Kajang Line was transferred to become part of the MRT Putajaya Line.
Stations for MRT Putrajaya Line |
---|
![]() |
![]() |
↳ ![]() ![]() |
![]() |





The Sungai Buloh MRT station is hosted within the Sungai Buloh railway station as the railway station is an interchange station, with one section catering to the KTM Komuter and KTM ETS services, and another section for the MRT Putrajaya Line.
There is however no paid-area-to-paid-area integration as the MRT and the KTM services use different ticketing systems.
Station layout
The Sungai Buloh MRT station has a total of six tracks and three platforms, of which 4 tracks and 2 platforms are serviced by KTM and the other 2 tracks and a platform is serviced by the MRT.
Sungai Buloh station layout |
---|
LEVEL 3: MRT platform level |
Platform 1: ![]() |
Island platform |
Platform 2: ![]() |
LEVEL 2: MRT Concourse |
Toilets, MRT station machinery rooms |
LEVEL 1: Common Concourse |
KTM faregates, MRT faregates, Ticketing Machines, Customer Service Offices, Station Control, Shops, Entrance B pedestrian bridge to both sides of Jalan Kuala Selangor |
LEVEL G: KTM platform level |
Side platform |
Platform 1: ![]() |
Bypass Track |
Bypass Track |
Platform 1: ![]() |
Side platform |
LEVEL G: Street side area |
Entrance A, Feeder Bus Terminal, taxi lay-by, kiss and ride lay-by, staff parking, walkway to multi-storey park and ride building |
The common concourse of the Sungai Buloh KTM and MRT Station, with the fare gates to the KTM section on the left and the MRT gates to the right at the far end.
The station has a common elevated concourse shared by the MRT and the KTM.
The ticket vending machines and ticketing offices for both services, as well as two retail outlets are located at this common concourse. The concourse was constructed over the four KTM tracks.
From this common concourse, stairs, escalators and lifts descend from within the KTM paid area beyond the faregates to the two at-grade side platforms which were the existing platforms of the previous KTM station.
Similarly beyond the MRT faregates, stairs, escalators and lifts bring passengers up to the MRT concourse level and the a further level up to the single island platform of the MRT line.
The paid areas for both services however are not connected and there is no paid-area-to-paid-area integration. This is because the KTM and MRT use different ticketing systems.
Location of station
The Sungai Buloh MRT station is located north of Jalan Kuala Selangor near the intersection with Jalan Sungai Buloh, and also Jalan Hospital.

Around this MRT station, you can find these nearby attractions within short walking distance.
- elc International School
- Masjid Jamek Pekan Sungai Buloh
- Park N Ride Sungai Buloh
- Sierramas Heights
- Sierramas West Clubhouse
- Sungai Buloh Chinese Cemetery
- Sungai Buloh Crematorium
Note: This is an ongoing update. More places will be added soon.

The Sungai Buloh MRT station is located at the same location as the former Sungai Buloh railway station.
Entrances and Exit
The Sungai Buloh station has three entrances.
The main entrance is Entrance A which has escalators, stairs and lifts rising from at-grade level to the common concourse, serving both MRT and KTM users.
The other entrance is Entrance B and C is located at the south side of the common concourse and is linked to a staircase down to both sides of Jalan Kuala Selangor.
The entrance A is located at dedicated station road from Jalan Hospital and Jalan Kusta. It provides access to the feeder bus terminal, taxi and private vehicle lay-by, multi storey park and ride, Masjid Jamek Pekan Sungai Buloh, Kampung Masjid, and SJK(T) Saraswathy.


The entrance B can be accessed via pedestrian bridge from Jalan Kuala Selangor. It allows access to the trunk bus stop, and taxi lay-by.

The entrance C can be accessed via pedestrian bridge from Jalan Kuala Selangor. It allows access to the trunk bus stop, and taxi lay-by.







Facilities & services
The Sungai Buloh MRT station provides following facilities and services for your convenience.
- Feeder bus
- Escalator
- Public toilets
- Public telephone
- Park and ride
- Bicycle parking
- Lift
- Island platform
- Surau
- Ticket vending machine
- Customer service office
- Ramp access
- Tactile tiles
- Disabled-friendly toilets
- Low lift buttons for wheel chair users
- Braille for the lift buttons
- Staff at stations to provide assistance
- Low counters for wheel chair users






Connection to KTM Komuter
The Sungai Buloh KTM station is integrated with the MRT station through a common concourse.
Passengers can purchase the KTM ticket at the concourse level and head towrd the ground level to reach the KTM Komuter platform level.


Feeder bus services
With the opening of the Kajang MRT Line, feeder buses also began operating linking the station with several housing areas and villages in and near Sungai Buloh.

The feeder buses operate from the station’s feeder bus hub accessed via Entrance A of the MRT station.
Feeder Buses |
---|
T100 – Sungai Buloh MRT station to / from Hospital Sungai Buloh and UiTM Sungai Buloh |
Jalan Hospital ➝ Hospital Sungai Buloh ➝ UiTM Sungai Buloh |
T101 – Sungai Buloh MRT station to / from Bukit Rahman Putra |
Jalan Hospital ➝ Jalan Kusta ➝ Kampung Melayu Sungai Buloh ➝ Persiaran Bukit Rahman 3 ➝ Persiaran Bukit Rahman Putra 1 ➝ Jalan Besar Bandar Baru Sungai Buloh ➝ Jalan Kuala Selangor |
T102 – Sungai Buloh MRT station to / from Kampung Paya Jaras, Kubu Gajah, and Aman Suria |
Jalan Kuala Selangor ➝ Jalan Paya Jaras Tengah ➝ Jalan Kubu Gajah |
T103 – Sungai Buloh MRT station to / from Damansara Damai |
Jalan Kuala Selangor ➝ Jalan PJU 10/1 |
T105 – Sungai Buloh MRT station to / from Matang Pagar |
Jalan Kusta ➝ Jalan Kampung Melayu Sungai Buloh ➝ Jalan Matang Pagar ➝ Jalan SP 4 ➝ Jalan SP 17 |
The trunk bus services do not enter the station area but stop at bus stops along Jalan Kuala Selangor.
From these bus stops, access to the station is via the overhead pedestrian bridge to Entrance B of the MRT station.
Bus | Service Route | Via |
---|---|---|
Selangor Omnibus 100 | Medan Pasar, Kuala Lumpur | Kuala Selangor |
Selangor Omnibus 101 | Bandar Saujana Utama | Sungai Buloh MRT station |
Selangor Omnibus 107 | Medan Pasar, Kuala Lumpur | Bestari Jaya (Batang Berjuntai) |


Park and ride facility
At the Sungai Buloh integrated station, a total of 1,236 car parking lots and 263 motorcycle parking lots are available.


The Park and Ride facility at the Sungai Buloh integrated station is operated by First City Parking Sdn Bhd (03-78872622).
The parking rates for MRT user are RM4.30 (per day per entry) and RM11.00 (maximum per day / overnight charges). The parking rates for non MRT user are RM3.30 for first hour and RM1.10 subsequent Hour, and RM11.00 (maximum per day / overnight charges).
The Parking rates for motorcycle is RM1.10 per entry per day at all Park and Ride.
Free first 15 minutes of parking charges (passing through) at all Park and Ride. Standard rates per hours will apply after 15 minutes for Non MRT user.
For Park and Ride user, please use the same Touch ‘n Go card for parking and train for RM4.30 per entry charge on the same day.
The same Touch ‘n Go card must be used on your return journey from the MRT Station to the Park and Ride.
You must leave the Park and Ride within 2 hours of exiting the MRT station fare gates.
Hourly parking rates per hour will apply if you re-enter and exit the same station without using the train.
If user park beyond 12.00 midnight, the “Maximum Per Day / Overnight Charges” will apply on top of previous daily charges.
The parking rate is inclusive of 6% SST tax as required by the government.
Park at your own risk. Lock vehicles and remove valuables. The management is not responsible for any loss or damage.
For any enquiries, please email to or call the appointed operator, First City Parking Sdn Bhd at 03-78872622.
Information may be updated without prior notice by the MRT Corp.
Read more on Park and Ride facility at Sungai Buloh station.
Station Statistics
Sungai Buloh MRT station statistics | |
---|---|
Location | Sungai Buloh, Selangor, Malaysia. |
Lines | ![]() |
Structure | Elevated |
Platforms | 1 island platform |
Tracks | 4 |
Parking | Available with payment. 1236 parking bays, 258 motorcycle bays. |
Bicycle facilities |
Available. 30 bicycle bays. |
Opened | 16 December 2016 |
Owned by | Mass Rapid Transit Corporation Sdn Bhd |
Reference | Sungai Buloh station on wikipedia |

MRT stations of MRT Putrajaya Line
The MRT Putrajaya Line is the second line of the KVMRT Project to be developed after the successful completion of first line —
MRT Kajang Line in July 2017.

The MRT Putrajaya alignment spans a total length of 57.7km, consisting of 44.2km of elevated tracks and 13.5km running through underground tunnels. It has 39 operational stations of which 30 stations are elevated stations and 9 underground stations.