The following are some of the pictures of Stadium Kajang MRT station during construction.
📅 March 2017
Ongoing steel works to the entrance of the Stadium Kajang Station.
Ongoing steel works to the entrance of the Stadium Kajang Station.
📅 February 2017
Completion works of the entrance to the Stadium Kajang Station.
📅 January 2017
Aerial view of the Stadium Kajang MRT Station undergoing construction works.
Aerial view of Stadium Kajang MRT station and the stadium.
View of the pedestrian bridge over Jalan Sungai Chua linking the Stadium Kajang Station with Kajang town.
📅 August 2015
Aerial view of the construction of the Stadium Kajang Station in progress.
Aerial view of the construction of the Stadium Kajang Station in progress.
📅 July 2015
Construction of the Stadium Kajang Station in progress.
Aerial view of the Stadium Kajang Station which is under construction.
Aerial view of the Stadium Kajang Station which is under construction.
Aerial view of the Stadium Kajang Station which is under construction.
View of the MRT guideway skirting Kajang town centre.
View of the MRT guideway skirting Kajang town centre.
📅 May 2015
The Stadium Kajang Station under construction.
View of the platform level of the Stadium Kajang Station.
★ These pictures of Stadium Kajang MRT Station are of credits to Mass Rapid Transit Corporation Sdn Bhd and the original copies are available at MRT Corp official website.
MRT stations of MRT Kajang Line
The MRT Kajang line is the first line of the Klang Valley Mass Rapid Transit Project (KVMRT) that began full operations in July 2017.
The MRT Kajang Line spans a total length of 51km and it runs underground for a distance of 9.5km beneath the centre of Kuala Lumpur while the rest of the alignment is elevated. The line has 30 stations of which 7 are underground station and 1 is provisional station (Bukit Kiara).
The following is a simplified table showing the integrations and connections of MRT Kajang Line with other rail systems to complete the Greater Kuala Lumpur / Klang Valley Integrated Transit System.
Stations for MRT Kajang Line | |
---|---|
KG04 Kwasa Damansara ⇄ PY01 Kwasa Damansara | |
KG05 Kwasa Sentral | |
KG06 Kota Damansara | |
KG07 Surian | |
KG08 Mutiara Damansara | |
KG09 Bandar Utama | |
KG10 Taman Tun Dr Ismail (TTDI) | |
KG12 Phileo Damansara | |
KG13 Pusat Bandar Damansara | |
KG14 Semantan | |
KG15 Muzium Negara ⇄ KJ15 KL Sentral ⇄ MR1 KL Sentral ⇄ KA01 KS01 KL Sentral ⇄ KT1 KE1 KL Sentral |
|
KG16 Pasar Seni ⇄ KJ14 Pasar Seni ⇄ KA02 Kuala Lumpur |
|
KG17 Merdeka ⇄ AG8 SP8 Plaza Rakyat |
|
KG18A Bukit Bintang ⇄ MR6 Bukit Bintang |
|
KG20 Tun Razak Exchange (TRX) ⇄ PY23 Tun Razak Exchange (TRX) |
|
KG21 Cochrane | |
KG22 Maluri ⇄ AG13 Maluri |
|
KG23 Taman Pertama | |
KG24 Taman Midah | |
KG25 Taman Mutiara | |
KG26 Taman Connaught | |
KG27 Taman Suntex | |
KG28 Sri Raya | |
KG29 Bandar Tun Hussein Onn | |
KG30 Batu 11 Cheras | |
KG31 Bukit Dukung | |
KG33 Sungai Jernih | |
KG34 Stadium Kajang | |
KG35 Kajang ⇄ KB06 Kajang |
Site Search
Did you find what you are looking for? Try out the enhanced Google Search: