The following are some of the pictures of Muzium Negara MRT station during construction.
📅 July 2017
Modes of public transport from yesteryear.
Escalator access to the train boarding platforms.
Faregates for Muzium Negara station.
Ticket vending machines on the concourse level.
Boarding Platform 1: Sungai Buloh – Kajang Line towards Kajang.
Public transport from the early days.
Concourse level of the Muzium Negara station.
Concourse level of the Muzium Negara station.
Boarding platforms of Muzium Negara station.
Boarding platforms of Muzium Negara station.
📅 April 2017
Landscaping and turfing done the Muzium Negara Station.
View of the platform level of the Muzium Negara Station.
📅 February 2017
Automated fare collection gates that have been installed inside the Muzium Negara Station.
The customer service office that has been built inside the Muzium Negara Station.
📅 January 2017
Aerial view of Muzium Negara MRT station in front of the Muzium Negara building.
Entrance of the MRT station next to the Muzium Negara building.
Entrance of Muzium Negara station near Muzium Negara.
Entrance of Muzium Negara station near KL Sentral.
📅 December 2016
Landscaping works that had commenced at the Muzium Negara Station.
📅 October 2016
View of the entrance and ventilation buildings of the Muzium Negara Station.
An MRT work train locomotive transporting equipment passing through the Muzium Negara Station.
📅 August 2016
Entrance and ventilation buildings of the Muzium Negara Station taking shape.
View of the concourse level of the Muzium Negara Station.
Escalators and staircases leading to the platform level of the Muzium Negara Station.
View of the construction works at the platform level inside the Muzium Negara Station.
Artist impression
Artist impression of Muzium Negara station.
★ These pictures of Muzium Negara MRT Station are of credits to Mass Rapid Transit Corporation Sdn Bhd and the original copies are available at MRT Corp official website.
MRT stations of MRT Kajang Line
The MRT Kajang line is the first line of the Klang Valley Mass Rapid Transit Project (KVMRT) that began full operations in July 2017.
The MRT Kajang Line spans a total length of 51km and it runs underground for a distance of 9.5km beneath the centre of Kuala Lumpur while the rest of the alignment is elevated. The line has 30 stations of which 7 are underground station and 1 is provisional station (Bukit Kiara).
The following is a simplified table showing the integrations and connections of MRT Kajang Line with other rail systems to complete the Greater Kuala Lumpur / Klang Valley Integrated Transit System.
Stations for MRT Kajang Line | |
---|---|
KG04 Kwasa Damansara ⇄ PY01 Kwasa Damansara | |
KG05 Kwasa Sentral | |
KG06 Kota Damansara | |
KG07 Surian | |
KG08 Mutiara Damansara | |
KG09 Bandar Utama | |
KG10 Taman Tun Dr Ismail (TTDI) | |
KG12 Phileo Damansara | |
KG13 Pusat Bandar Damansara | |
KG14 Semantan | |
KG15 Muzium Negara ⇄ KJ15 KL Sentral ⇄ MR1 KL Sentral ⇄ KA01 KS01 KL Sentral ⇄ KT1 KE1 KL Sentral |
|
KG16 Pasar Seni ⇄ KJ14 Pasar Seni ⇄ KA02 Kuala Lumpur |
|
KG17 Merdeka ⇄ AG8 SP8 Plaza Rakyat |
|
KG18A Bukit Bintang ⇄ MR6 Bukit Bintang |
|
KG20 Tun Razak Exchange (TRX) ⇄ PY23 Tun Razak Exchange (TRX) |
|
KG21 Cochrane | |
KG22 Maluri ⇄ AG13 Maluri |
|
KG23 Taman Pertama | |
KG24 Taman Midah | |
KG25 Taman Mutiara | |
KG26 Taman Connaught | |
KG27 Taman Suntex | |
KG28 Sri Raya | |
KG29 Bandar Tun Hussein Onn | |
KG30 Batu 11 Cheras | |
KG31 Bukit Dukung | |
KG33 Sungai Jernih | |
KG34 Stadium Kajang | |
KG35 Kajang ⇄ KB06 Kajang |
Site Search
Did you find what you are looking for? Try out the enhanced Google Search: